Tata Steel Limited Jamshedpur - Setting Up of TSCR Roll Shop

Tata Steel, Jamshedpur, TSCR Roll Shop project was one of three major projects undertaken by Arcum Group where Arcum (as consortium partner of Tenova – Pomini) was awarded an EPC (Engineering, Procurement & Construction) contract from Tata Steel. The scope included complete mechanical/structural works, electrical systems, and utilities.

 

Arcum was responsible for full project execution from basic design till commissioning, with a total fabrication of 289 tons and erection of 2,750 tons required in the project.

Our Role as the Local Supply Partner

As a local supplier, Arcum managed material procurement, storage, and delivery. We coordinated quality assurance and conducted stage inspections throughout the supply chain. Our scope included delivering everything from basic structural components to specialized systems like air conditioning units and hydraulic equipment.

Electrical

Distribution Systems
  • Cable trays with supports
  • Power cables and sockets
  • Cable glands and plates
  • Main Light Distribution Board (MLDB)
  • Emergency Light Distribution Board (ELDB)
Power Supply
  • 63A welding sockets

Mechanical/Structural

Support Systems

  • Hydraulic jacks for roll grinder inertia blocks
  • Steel racks and pads for transfer car
  • Beam and girder for automatic loader
  • Rail base plates and clips

Process Equipment

  • Pumps for grinding pit
  • Roll lifting devices
  • Steel tanks for grinder pit
  • Discharge channels

Safety & Access

  • Floor plates and trench covers
  • Staircase and handrails
  • Safety fences with doors

 

HVAC/Utilities

Air Conditioning

  • Control pulpit AC system
  • Electrical control room AC system

Consumables

  • First fill oils and lubricants

Utility Systems

  • Industrial pipelines for air & water
  • Chocks & bearing washing stand with pipelines

Our Role as a Service / Commissioning Partner

Arcum Engineering served as the comprehensive service and commissioning partner for the Roll Shop at Tata Steel, TSCR project for our principal Tenova – Pomini.  This included the erection, testing, and commissioning of critical Roll Shop equipment like roll grinders, automatic loaders, de-chockers, and their supporting systems.

Equipment Installation

  • Complete erection, testing and commissioning of roll shop equipment including grinders, loaders, de-chockers, washing machines, and utility systems

Project Management

  • Skilled manpower deployment (operators, technicians, supervisors)
  • Site management including material handling, storage, and security
  • Daily progress monitoring and coordination with customer/consultant

Quality & Compliance

  • Implementation of quality standards (WPS, PQR, QAP)
  • Conducting cold tests and performance guarantee tests
  • Documentation for certification and payment milestones
  •  

Result

  • The project involved erecting 2,750 tons of equipment, managed end-to-end from installation through to final commissioning and handover.

Our Role as a Service / Commissioning Partner

As the EPC contractor, our team of trained engineers took full responsibility right from equipment installation to testing and plant setup

Equipment Installation & Commissioning:

  • Roll grinding systems (Work & Back-up)
  • Automation equipment (Loaders, De-chockers)
  • Material handling systems (Cranes, Railways)
  • Auxiliary equipment (Washing machines, Tilters)

Project Execution:

  • Manpower provision (Operators, Technicians, Supervisors)
  • Testing oversight (Cold tests, PG tests)
  • Site and safety management
  • Customer coordination and quality control
  • Documentation and certification

The project involved erecting 2,750 tons of equipment, managed end-to-end from installation through to final commissioning and handover.